WALLACE BEITZEL DEPOSITION
- The EKV NMD Chief Engineer Mr. Wallace [Wally] D. Beitzel of
Northrop Grumman Corporation [Prior known as TRW INC.] provided Deposition under oath that:
" THE WITNESS: To the best of my knowledge, the contract from the Government to Boeing -- to Rockwell that flowed down to TRW did not include a requirement for robustness."
- Maybe this will refresh alleged memory and alleged responsibility
as the Government required and defined in its SOW also known as Trial Exhibit # 33.
" A level of robustness shall be designed into the algorithms to eliminate the redevelopment of algorithms as a result of flight experiment redefinition."
|
|