To the people of Europe, please purchase and read my book KNDU187, prior to placing US false NMD technologies in your home country. Many secrets for you to figure out. 
KNDU187 paper back book is available. Fiction, or is it? 

ORDER by clicking here on: KNDU187  or on Amazon.com 

NiraSchwartz.com
National Missile Defense [NMD] Fraud;
Government Corruption; 
and
  Trials Exhibits

Whistle Blower [Qui-Tam] Cases: 

D.C. 96-3065 RSWL - Appeal 9th Circuit Case 03-55495
D.C. 01-4937 RSWL - Appeal 9th Circuit Case 03-55571 - Petition

US Federal Claims Cases: 03-37C - US Court of Appeal 05-5063 - US Supreme 
US Federal Claims Cases: 03-786C - US Court of Appeal 04-5113

CA State BAR Complaint: 05-2875; Appeal; First Response; US Supreme 05-11161
NAVY Complaint:  20050489 - Final Decline to accept
FOIA - Refused

D.C. 06-4010 DDP (JCx)Schwartz vs. Government, MIT, LLNL, AERO
Appeal to the 9th Circuit case 07-55091

Home
KNDU187 Book
KNDU2008 Patent
Criminal Reports
Jamieson Committee
Fragile NMD Technology
GAO Reports
US Attorney General
Case 96-3065 RSWL
Physics Laws
FBI Letter
Consulting US Government
Government Corruption
Please Help
Contact me
N. Korea Threat
Raytheon CV 01-4937 RSWL
Boeing & HOT BACK-UP
Raytheon Legal VA
MIT/LL False Reports
My Reply 05-5063
International
Current News
Northrop/G. HR Manual
'SSSS' Yellow
NAVY - Games
US Supreme Court
Links
Letter to US President
Wally Beitzel Deposition
Conflict Of Interest
ARMY Scope Of Work
NMD Contract DASG60-90-C-0165
Ray Maddalone Deposition
Roy Danchick Deposition
Henry J. Crowder Deposition
NMD-My-Copyrights
New Warhead Patent
Hon. Congressman H. Berman
FOIA - refused
State Bar Complaint
Case D.C. 06-4010 DDP (JCx)


On May 1998 the following persons: M-J. Tsai and Charles Meins at MIT Lincoln Laboratory; Larry Ng and Frank Handler at Lawrence Livermore National Laboratory [LL]; and Glenn Light at Aerospace Corporation [AC];  issue a report titled:

" Independent Review of TRW Discrimination Techniques Final Report"

[This group of MIT/LL/AS is also addressed as the POET [Phase One Engineering Team]

This alleged "Independent Review" was in effect a white wash created by the ARMY/DOJ; MIT/LL where the inventors of the NMD/EKV concept, and in effect evaluating themselves; far away from being independent reviewers; Mr. Glenn Light had many common projects with TRW, and with Mr. Robert Hughes my Boss at TRW [currently Northrop/Grumman] during 1995-6.
The Poet Team [MIT/LL/AC] had created Tests procedures to validate the performance of the NMD/EKV technologies. Their May 1998 Independent report was based on their own test procedures, that failed to test the performance against the Government Technical Requirement Document [TRD]. 
While the TRD specifically states that KEY parameters and their mean are not accurately known, but rather a wide range of possible values, the Poet ignored that, in order to falsely present success identification of the warheads.
The Inspector General/Defense Criminal Investigator Service [IG-DCIS] SA Sam Reed informed in writing the Poet that they need to perform their Test/Validations against the Government TRD. 
The Poet responded in a letter dated June 10, 1998 to Mr. Keith Englander at Ballistic Missile Defense Organization [BMDO] a division of the ARMY, stating that they will NOT Test/Validate NMD/EKV technology against the TRD. The response was made in writing by Dr. Frank Handler at Laurence Livermore National Laboratory [LL].
Mr. Keith Englander and the ARMY knowingly left the Poet to do what ever they wanted. Including reporting false excellent NMD/EKV technologies performance, to the Congress and the Senate; With no one controlling them. 
There is NO Government, NO DOJ, No IG-DCIS, and NO GAO investigators to control the PoetNo Laws and NO Constitution.
SA Sam Reed fought very hard to prevent the whitewash and the Fraud Report the Poet committed; His endless efforts contributed to the cancel of his contract with DCIS and his alleged retirement. 

  • MIT/LL were the inventors of the NMD/EKV concept, and therefore could not be Independent Reviewers. Please see  Letter_to_DOJ. They were carefully selected by the ARMY despite SA Reed's at DCIS objections. Till today, MIT/LL receive over $700 million dollars per year to be independent evaluators of their own technologies. 

  • MIT/LL/AS to assure the receiving of river of money reported that the NMD EKV concept as implemented by TRW [currently Northrop/Grumman] and also by Raytheon:

    " ..are well designed and work properly, with only some refinement or redesign required to increase the robustness of the overall discrimination function." 
    Please see MIT/LL_ Independant_Report.

  • But few paragraph latter in this alleged Independent Report MIT/LL/AC stated a generic statement, that is free of any implementation mathematical tools. This generic statement is applicable to TRW [currently Nortrop/Grumman] and or Raytheon implementation technologies of the NMD/EKV concept; both companies had to comply with the same TRD dated September 1993, and the same TRD versions after of it;  This generic statement of MIT/LL/AC say:

    " Reliable prior knowledge on many of the threat types included in the TRD cannot be obtained.
    Please see MIT/LL_Independent_Report_(2)

  • How Many of threat types in the TRD a reliable prior knowledge is not available? Was it reported by MIT/LL/AC? Is there always a non-reliable knowledge that is common to all of the threat types? Is the deployed objects mean temperature one of them? How it is impacting the ability to differentiate the warhead from the rest of the objects deployed? How this lack of parameters values [and not just the objects temperatures] impact the validity performance of the NMD/EKV concept? How this lack of accurate knowledge of KEY values impact cluster selection?  Is any of the GAO Investigators can assure the Nation that the NMD/EKV concept is robust when prior knowledge of KEY parameters  is always not available and/or reliable? What about material emissivity? Is it a KEY parameter? What happens to its value when a blue balloon is suddenly replaced by a white and/or black balloon? What happen to KEY parameters values when nuclear spikes are on the Infra Red signals? Is there a different between nuclear spikes and earthshine spikes on the Infra Red signal? Is it possible to clean the spikes out of the Infra Red signals ? Can the GAO Investigators can assure the Nation that the they check the delay created by cleaning the spikes and what the value of the delay in compare to End of Game time? What does it all mean for the NMD/EKV concept? How does it impact the NMD/EKV technologies performance of Raytheon / TRW [currently Northrop/Grumman] ? 

  • Poet refused to perform Test/Validation of NMD/EKV against the TRD. Please see Poet_Refuse_Frank_Handler and Poet_Refuse_TRD

  • GAO Investigators, how you can sleep at night with the whitewash reports you created? You failed to Test/Validate the NMD/EKV concept and implementing technologies against the laws of physics and against the TRD. Your reports allow the NMD/EKV false concept and false implementations technologies to go production.

  • And while KEY parameters values are not available and always not reliable, MIT/LL/AC were quick to report that the NMD EKV TRW [currently Northrop/Grumman] and Raytheon technologies "work properly"... and the river of money keeps coming .....and the false technologies go to production ... and the Nation security is in danger...

  • I have reported to the Government over 250 issues and catastrophe in the MIT/LL/AC reports to why the NMD EKV concept and its implemention technologies are false, non robust and in non-compliance with the laws of physics. That the Nation security is in danger if Raytheon and/or TRW [currently Northrop/Grumman] go production. My report was classified. 

  • GOD Save America. Please Help and Donate money to carry these cases to the Supreme Court in Washington. Because this is the ONLY way to remove these false technologies from protecting the Nation.